| S.No. |
Last
Date of submission of tender |
| 1 |
08-08-2008 15:00:00 |
| |
For Comprehensive Maintenance & Operation of of Electro- Mechanical Services for JB Exch & CTO Bldgat Rajkot AND Comprehensive Maintenance of E/M/S for Aji Exch at Rajkot
|
| 2 |
16-07-2008 11:30:00 |
| |
For planning, engineering, supply, installation, testing & commissioning of GSM/ UMTS based cellular mobile and supply, installation, testing & commissioning of infrastructure for network of capacity for twenty five million lines to be rolled out in three phases in the licensed service areas of BSNL in South Zone covering Andhra Pradesh (AP), Karnataka ( KTK), Kerala (KL), Tamilnadu (TN), telecom circles and Chennai Telecom District ( CHTD)
|
| 3 |
16-07-2008 11:30:00 |
| |
For planning, engineering, supply, installation, testing & commissioning of GSM/ UMTS based cellular mobile and supply, installation, testing & commissioning of infrastructure for network of capacity for eighteen million lines to be rolled out in three phases in the licensed service areas of BSNL in East Zone covering Assam (AS), Bihar (BH), Jharkhand ( JKD), Orissa (OR), West Bengal (WB), A&N Is. (A&N), North East - 1(NE-1), North East – II (NE-2) telecom circles and Calcutta Telephone District ( CTD)
|
| 4 |
16-07-2008 11:30:00 |
| |
For planning, engineering, supply, installation, testing & commissioning of GSM/ UMTS based cellular mobile and supply, installation, testing & commissioning of infrastructure for network of capacity for twenty five million lines to be rolled out in three phases in the licensed service areas of BSNL in West Zone covering Maharashtra(MH), Gujarat(GJ), Madhya Pradesh(MP), Chattisgarh(CG)
|
| 5 |
16-07-2008 11:30:00 |
| |
for planning, engineering, supply, installation, testing & commissioning of GSM/ UMTS based cellular mobile and supply, installation, testing & commissioning of infrastructure for network of capacity for twenty five million lines to be rolled out in three phases in the licensed service areas of BSNL in North Zone covering Punjab , Himachal Pradesh, Haryana, , J&K, Uttar Pradesh ( East), Uttar Pradesh ( West), Rajasthan, Uttrakhand telecom Circles
|
| 6 |
16-07-2008 11:30:00 |
| |
For Planning, engineering, supply, installation, testing & commissioning of GSM/ UMTS based cellular mobile and supply, installation, testing & commissioning of infrastructure for network of capacity for twenty five million lines to be rolled out in three phases in the licensed service areas of BSNL in West Zone covering Maharashtra(MH), Gujarat(GJ), Madhya Pradesh(MP), Chattisgarh(CG)
|
| 7 |
03-07-2008 15:00:00 |
| |
For Providing & erecting 6 meter (3 nos) , pole type tower for mobile BTS site at Arun Plaza, Dange Chowk , Thergaon , Pune
|
| 8 |
20-06-2008 11:00:00 |
| |
FOR PROVIDING SECURITY GUARDS FOR MAINTENANCE OF CASH COLLECTION CENTRE/ CUSTOMER SERVICE CENTREs OF BARRACKPORE AREA.
|
| 9 |
06-06-2008 15:00:00 |
| |
For Supply of Blank Computer Stationery.
|
| 10 |
04-06-2008 15:00:00 |
| |
For OFC CONSTRUCTION WORKS IN BHANDARA SSA
|
| 11 |
04-06-2008 11:30:00 |
| |
For 40 M NB LW Tower- 400 Nos.
|
| 12 |
17-05-2008 15:00:00 |
| |
Printing and Supply of Publications & Certificates Tendered Quantity : Approximately 1,59,790 Pages ( Page size : A4 / As per sample)
|
| 13 |
03-06-2008 13:00:00 |
| |
For Underground cable construction
|
| 14 |
03-06-2008 11:30:00 |
| |
Supply of SN Name of item Qty 1 PLB HDPE pipe 40/33 mm ( with rope) 200 mtr 15084 kms 2 Plastic coupler 70090 3 End plug 87930 nos 4 Cable sealing plug 20690 5 Duct cutter 365 nos 6 Cable spanner 346 nos 7 Replacement blade 315 nos
|
| 15 |
02-06-2008 15:00:00 |
| |
Providing EI & Fans for new Rented T E Bldg at Kasbe Tadwale, Dist Osmanabad
|
| 16 |
02-06-2008 15:00:00 |
| |
Replacement of faulty change over switch at MW Bldg Tuljapur, T E Naldurg Arali, Mangrul & Donja, Dist. Osmanabad
|
| 17 |
31-05-2008 15:00:00 |
| |
FOR ANNUAL MAINTENANCE CONTRACT for window/ split AIR CONDITIONERS in Chikmagalur SSA
|
| 18 |
31-05-2008 15:00:00 |
| |
For OFC Construction Work under Nagaur SSA area Section IV th
|
| 19 |
31-05-2008 14:00:00 |
| |
FOR SUPPLY & INSTALLATION OF COMPUTERS & PERIPHERLAS/ UPS/ INVERTOR IN KOLLAM SSA for a period of One year.
|
| 20 |
31-05-2008 14:00:00 |
| |
FOR SUPPLY & INSTALLATION OF COMPUTERS & ERIPHERLAS/ UPS/ Invertors IN KOLLAM SSA.
|